Tekna Electrical Ltd swiftly responded to an urgent power outage at a commercial office building, ensuring minimal disruption to business operations. Within an hour, our team was on-site to assess the situation and implement a solution that restored functionality safely and efficiently.
Upon arrival, we conducted a thorough inspection, identifying that water had accumulated beneath the floor tiles, posing a significant risk to the electrical system. By mapping out the extent of the water damage, we determined the impact on power distribution and took immediate steps to isolate the affected area for further investigation.
Tracing the source of the leak led us to a concealed issue behind a restroom wall. Once identified, we took immediate action to stop the water from spreading further, preventing additional damage. Sections of the flooring were carefully removed and specialist equipment was used to dry the area. Electrical connections exposed to moisture were safely disconnected to ensure a controlled recovery process.
With the immediate hazard contained, we worked alongside building management to clear the remaining water and recommended additional drying solutions to accelerate restoration. Power was scheduled to be reconnected once the area had fully dried, with our team returning over the weekend to replace the damaged components and ensure the building was fully operational for business Monday morning.
This rapid response and structured approach allowed the office to resume business with minimal downtime. By identifying the root cause quickly and coordinating closely with on-site teams, Tekna Electrical Ltd delivered a safe, efficient, and reliable resolution, reinforcing our commitment to providing fast and effective electrical solutions.